top of page
Graph screen interaction

Through strategic planning and a cohesive team-building approach, my clients have managed to get the results they sought after from my consulting services. Take a look at what I’ve done in the past, and contact me at dgrace@graceprofsolutions.com

water shut-off valve
Business Meeting

Broward County Aviation Department Water System Master Plan and Hydraulic Modeling

The Water System Master Plan for the Fort Lauderdale-Hollywood International Airport (FLL) is intended to provide a comprehensive planning document for the Broward County Aviation Department (BCAD) that provides information and guidance for the sound stewardship of the potable water and fire protection system at the airport. It provides an assessment of current system deficiencies, determine future water supply requirements, recommend improvements that correct existing system deficiencies, and recommend improvements to meet future system needs.

BCAD InfoWater Model.png

The hydraulic modeling of the water distribution and fire main system was conducted using the ©InfoWater modeling software which integrates a GIS infrastructure database of their existing pipes, valves, hydrants and other water distribution features with a graphic-based hydraulic modeling software.

Cutler Manor Apartments Sanitary Sewer Evaluation Survey

The main purpose of a Sewer System Evaluation Survey (SSES) is to identify and correct excesive infiltration and inflow (I/I) in the sanitary sewer collection system. The survey consists of a visual inspection of the system components performing flow and smoke tests to identify sources of I/I in the system, as well as defects, and illegal connections. The goal of the SSES is to assure that the sanitary sewer system is working properly, as designed.

Cutler Manor_edited_edited.jpg

City of Miramar Reclaimed Water System Hydraulic Modeling

The City of Miramar was undergoing further expansion of the existing Reclaimed Water System and required hydraulic modeling services to validate the proposed reclaimed water pipe sizes. The Scope of Services included data collection, model verification and updating water demand allocation, identification of the evaluation criteria to be utilized, and conducting the hydraulic modeling to determine the recommended pipe sizes.  

Reclaimed Water

City of Opa-locka Grant Funding Technical Support
127th Street Canal Rehabilitation

Provided technical support for the City's grant application to the Rebuild Florida Mitigation General Infrastructure Program overseen by the Florida Department of Economic Opportunity (FDEO). The City received $7M in state funds for the remediation of the 127th Street Canal.

Canal

City of Opa-locka Stormwater Master Plan

Provided technical support (coordination with City and hydraulic modeling team), prioritization and ranking of problem areas, identification of corrective actions, and report preparation.

Stormwater Model

City of Riviera Beach Lift Stations Condition Assessment

Provided project management support (coordination with City and engineering team), to perform condition assessment on 49 lift stations within the city service area. 

Lift Station

PROJECTS

bottom of page